Skip to main content

Advance BOM

Advance BOM is used to define a process-wise manufacturing structure for an item. It maps production processes, sub-processes, materials issued or received at each process, overheads, plant, cost center, variant, attachments, and approval history.

When to use Advance BOM​

Use Advance BOM when:

  • Manufacturing needs a process tree rather than only material tabs.
  • Materials must be linked to specific processes or sub-processes.
  • Internal and external processes must be identified.
  • Process time, machine, vendor or user, and overheads must be maintained.
  • Advance Production Order should later pull the process-wise manufacturing structure automatically.

Pages in this section​

Mobile App Availability

This functionality is not available on the mobile app.