Editing, Amendment, Import, Approval, and Deletion

Advance BOM is controlled after it is approved or used by later production transactions.

Editing and deletion​

Editing or deletion is blocked when:

  • The Advance BOM is approved.
  • The Advance BOM is rejected.
  • The Advance BOM is unapproved and waiting in workflow.
  • A dependent transaction already uses the Advance BOM.
  • Another user is actively using the same record.

When editing is allowed, users can revise header values, process mapping, material mapping, overheads, remarks, attachments, and approval submission.

Amendment​

Use Amendment when a controlled change is needed after the Advance BOM has become part of the production process. The amendment keeps the record history instead of replacing the earlier structure silently.

Copy​

Use Copy to create a new Advance BOM from an existing structure. Review the BOM variant carefully because the item and variant combination must remain unique.

Import​

Use Import when process and material mapping is prepared externally in the approved import format. Review imported process levels, item types, issue/receive types, costs, and overheads before saving.

Approval and send back​

If Send for Approval is selected, the Advance BOM enters the approval workflow after saving. Approvers can approve or send back from pending approval. Send back requires remarks.

Deletion guidance​

Delete only records created incorrectly and not used by production. If an Advance BOM has already influenced production planning or advance production orders, use amendment or a new variant instead.