Process and Material Mapping
The Process & Material Mapping tab is the core of Advance BOM. It defines the manufacturing process tree and the items linked to each process.
Process lines
Each process line can include:
- Process code and process name
- Department
- Internal or external process type
- User or vendor, required for external process handling
- Machine
- Required time
- Cost
- Sub-process level
Process code and process name are required. When a process is external, the vendor must also be selected.
Adding materials to a process
Use the process line action to add item details under that process. Each item line includes:
- Item code and item name
- Quantity
- UOM
- Item type
- Issue or receive type
- Cost center, when required
- Description and attributes, when applicable
Item, quantity, UOM, item type, and issue/receive type are required. Use issue/receive type carefully because it controls whether the item is consumed by the process or received from the process.
Sub-processes
Use sub-process actions to build a hierarchy under a process. Sub-processes help represent multi-step production where each step has its own materials, time, machine, vendor, and overheads.
Sub BOM
When a selected item has an Advance BOM variant of its own, ZipERP can bring sub-BOM process and material details into the structure. Review the imported process tree before saving.