Creating an Advance Production Order
Create an Advance Production Order directly when production is being released for an item and variant without first selecting a sales order or planning request.
Initial fields
- Prd. Order Type: Required. Select the advance production order type.
- Item Code / Item Name: Required. Select the production item.
- Qty: Required. Enter the production quantity.
- UOM: Required. Select the unit for the quantity.
- Variant: Select the Advance BOM variant to load the process-wise structure.
If a variant is not selected, ZipERP asks for confirmation before creating the order without an Advance BOM structure.
Detail-page header
After selecting Go, review:
- Production order type
- Document date
- Document number
- Item
- Quantity and UOM
- Plant
- Variant
- Batch number
- Cost center, when enabled
The document date must be allowed for the user, including back-date entry controls where applicable.
Save
At least one item line is required before saving. Review the process and material mapping, order details, remarks, and Send for Approval option, then save the order.