Editing, Amendment, Copy, Approval, and Deletion
Advance Production Order is controlled once production execution starts.
Editing and deletion
Editing or deletion is blocked when:
- Goods issue or goods receipt has been posted against the order.
- The order is approved.
- The order is rejected.
- The order is unapproved and waiting in workflow.
- A dependent transaction already uses the order.
- Another user is actively using the same order.
When editing is allowed, users can correct header fields, process mapping, item mapping, overheads, schedule details, order references, remarks, and approval submission.
Amendment
Use Amendment for controlled changes after the order is active. Amendment preserves the production order history while allowing authorized changes to the process-wise structure.
Copy
Use Copy to create a new advance production order from an existing one. Review quantity, date, plant, variant, process schedule, material issue/receive types, and approval status before saving.
Approval and send back
If Send for Approval is selected, the order enters the configured approval workflow. Approvers can approve or send back from pending approvals. Authorized users can send back a selected order with remarks when dependent production activity does not block it.
Deletion guidance
Delete only orders created incorrectly and not used for production execution. If production activity has started, use amendment or an operational correction instead of deletion.