Process, Material, Overhead, and Schedule Details
Advance Production Order carries the process-wise structure from Advance BOM and lets users adjust the order-specific execution details.
Process and Material Mapping
The main process grid shows the process tree. Process lines can include process code, process name, department, process type, user or vendor, machine, required time, cost, and sub-process level.
Materials are linked under processes. Each item line includes item code, item name, quantity, UOM, item type, issue or receive type, cost center when required, and attributes when applicable.
Process dependency
When process dependency is active for the order type or loaded Advance BOM, process sequence is controlled. This helps ensure later processes are planned after required earlier processes.
Process Detail
Process detail includes:
- Process
- Department
- Process dependant on
- Process type
- User or vendor
- Machine
- QC template
- Required time
- Start date-time
- End date-time
- Cost and description
Start and end date-time values help production teams schedule work and evaluate process timelines.
Overhead Detail
Overhead detail includes overhead, quantity, UOM, rate, cost, and description. Overhead, quantity, UOM, rate, and cost are required when an overhead line is entered.
Order Details
Order Details show linked sales order or planning request references, including sales order number, sales order date, item, quantity, and description.