Creating a BOM
Creating a BOM starts with the main BOM details. After those details are confirmed, ZipERP opens the detail page where materials, processes, and overheads are entered.
Before you begin
Confirm that:
- The manufactured item exists and is active.
- The item has the required unit setup.
- Plant is available.
- Raw materials, packing materials, by-products, finished goods, process masters, overhead masters, machines, QC templates, and cost centers are available as needed.
- The variant name is known.
First step fields
Mandatory fields:
- BOM Type
- Item
- Base Qty
- Base UOM
- BOM Variant
- Plant
For process BOMs, these are also required:
- Yield
- Specific Gravity
- Total Base Qty
ZipERP calculates Total Base Qty for process BOMs from base quantity, yield, and specific gravity.
Starting the detail entry
- Open ERP > Production > BOM.
- Click New.
- Select BOM Type.
- Select the manufactured Item.
- Enter Base Qty and Base UOM.
- Confirm or enter BOM Variant.
- Select Plant.
- For process BOMs, verify yield, specific gravity, and total base quantity.
- Click Go.
ZipERP checks that the same item and BOM variant combination is not already created. If it already exists, change the variant or select the existing BOM instead.
Saving the BOM
On the detail page:
- Add the required material, process, finished goods, and overhead details.
- Add attachments if required.
- Keep Send for Approval selected if the BOM should enter the approval flow.
- Click Save.
After save, ZipERP creates the BOM and submits it for approval when an approval flow is applicable.