Skip to main content

Process BOM Details

A process BOM includes additional process-specific quantity controls.

Process-specific fields​

Process BOMs include:

  • Yield
  • Specific Gravity
  • Total Base Qty
  • Loss(%)
  • Total RM Consumption Qty

Total Base Qty is calculated from base quantity, yield, and specific gravity. Total RM Consumption Qty is used to control raw material consumption for process formulas.

Material entry differences​

For process BOMs, raw material entry can include process-related consumption controls such as required percentage, solvent percentage, material type, and loss-based quantity calculations where configured.

Use these fields carefully because they affect how production consumption is calculated.

Good practices​

  • Confirm yield and specific gravity before entering detailed raw materials.
  • Review total raw material consumption after changing base quantity, yield, or loss percentage.
  • Use process and overhead tabs to capture operational cost, QC, confirmation, and machine requirements.
  • Review the full BOM view before sending it forward for approval.